Camax stock and supply Elster A’s in either 5A Current Transformer Connection or A Direct Connection. This document is intended as a guide to help Suppliers of Elster Metering Systems Your Elster A Meter has been chosen by your Service Provider to . A Three-phase CT Meter available at MWA Technology. Speedy delivery from direct Rating. A, Elster three phase electricity CT meter, 5/10/ A.

Author: Dacage Bragar
Country: Bolivia
Language: English (Spanish)
Genre: Sex
Published (Last): 1 July 2010
Pages: 378
PDF File Size: 8.84 Mb
ePub File Size: 1.48 Mb
ISBN: 965-8-62472-417-5
Downloads: 63554
Price: Free* [*Free Regsitration Required]
Uploader: Vuzilkree

A way D type way D type way D type 5: Repeat for kvarh using left hand Test LED. Security The meter offers high security with many useful security features.

This is achieved by copying a Meter and a Scheme into the Meter list. When you have chosen the folder: Power Master Unit Power Master Unit meter compatibility does not allow different meter types to be programmed by the same scheme, therefore a separate manual support’s each application. The port can operate at baud rates of up to The default is ms. Safety requirements for meters are addressed in specific metering standards outlined below.

Check that the terminal cover plate is in place before installing the module.

A Three-phase CT Meter from MWA Technology

Please, log in or register. With a year product life, the A provides excellent, reliable electricity usage monitoring for a wide range of environments, and has several different features to allow for power cuts, tampering, and electricity pulses. Page of Go. Suitable for monitoring both three- and single-phase systems Appropriate for CT and whole current in commercial and elter environments Highly secure and resistant to tampering, power surges, and power cuts.

  HILAIRE BELLOC THE PATH TO ROME PDF

I haven’t used the Open Energy Monitor system as I have a specific requirement here, I ended up using a networked Arduino Ethernet board with a custom built shield with interfaces for the meters and energy monitor we have here. The A permits up to 90 days of load profile data to be collected in less than 30 seconds.

In such cases delivery of your equipment may be subject to rlster minor delay. There may be special days in the year when the tariff does not follow the normal pattern, e.

Elster A1140 MID CT Connected Polyphase Electronic meter with Pulse and Import/Export (UK504-041)

Season Changeover Dates A switching time for the 1 Jan is shown opposite. Add to Basket QTY. It definitely sounds as if what you’ve been doing is beyond my ken! Delta’s handbook gives one pin configuration, the board in the inverter gives another, and their “technical” help in the UK gave me another.

Data Stream Mode See Section Fixing And Connection Secure the lower end of the meter to the board using two 5mm dia.

Tariff Structure 8 Time-of-use TOU registers 4 Maximum demand registers 48 Switching times 6 Seasons 12 Change of season dates 32 Exclusion dates 13 End of billing dates Independent day control Daylight saving Deferred tariff Data Storage A Up to days of half hour data for one channel Programmable integration period Four channels of q1140 profile storage for any measured quantity Instrumentation values Security The meter offers high security with many useful security features.

You have no items in your shopping cart. A time and date stamp of the three most recent non-fatal error events is recorded where possible.

Don’t have an account? Enter the connection method and any outstation no. The Elster Elstr is also MID-approved and highly accurate so the user can have complete confidence in all the readings whilst benefitting from the clear, 8-digit, LCD display for local access and data recording.

  DIN 55468 PDF

Scheme Manager Context Menu with the options shown opposite becomes available. Optional Serial Data Port Fast data collection of cumulative registers, historical data and load profiling A using data stream mode System Connections 3 Element: We aim to process all orders we receive within 1 to 3 working days, however from time to time we do have an increased demand for certain products or there might be delays from the manufacturer.

The RJ11 socket provides optional RS communications allowing remote access to the same data as the optical port. System Connections 3 Element: Replace the terminal cover and fit appropriate seals The actual value of data can be viewed by placing the cursor on the plotted readings.

It’s also convenient for me as I like to dabble with these things: A time and date stamp of the three most a1104 events is recorded.

If damage has been sustained in transit, an immediate claim should be made to the Transport Company, and a report sent to the Elster Metering Systems branch office or agent. This option allows unwanted. An example of a switching program is below.

Use Save to save the error messages as Text Files.